For Batteries we use eight 6volt GC2 (225 AH) hooked in series and parallel for a 12v bank.
For charging we have 4 evergreen electric 210w panels and we use SES Flexcharge charge controllers on all our sites.
The site is ran by one WS-12-250 switch and a Mikrotik RB2011 at the site for routing.
On this particular site we've decorated the tower as a giant cross and we use the PoE scheduling feature of the WS to actuate a relay the turns a inverter on and off to power the Christmas lights that make up the cross. Who would have thought a WS as a glorified Christmas light timer!

CLICK IMAGES BELOW TO VIEW FULL SIZE